CATEGORIES
Latest news
- update stainless steel price of China
- update stainless steel price of China
- update stainless steel price of China
- update stainless steel price of China
- update stainless steel price of China
- update today Chinese Foshan market pri
Contact us
- ADD: No.38, Fenjiang South Road,Lanshi Metal Market,Chancheng District,Foshan City,Guangdong,China
- TEL: 0086-757-83553918
- MOB: 0086-18315766722
- FAX: 0086-757-83553917
- E-mail: jmrisingsun@126.com



stainless steel color pipes
- stainless steel
- color pipe
- Product description: all kinds of stainless steel color pipes
PRODUCT INTRODUCTION
Stainless Steel Pipe
1.own cold rolled factory and pipe making factory 2.quality is prime 3.Aod material,can be bend and well used for many area
Products Name |
Grade 201 Stainless Steel pipe |
|||
Standard |
GB/T18705, GB/T12770 |
|||
Grade |
201 ( Ni 0.8%-1.5%), 202 (Ni 4), |
|||
Wall Thickness |
0.25mm--1.75mm |
|||
Out diameter |
Round pipe:dia12.7mm - 159mm Square pipe size: 15*15 - 95*45 |
|||
Length |
5.88m 6m .6.1m or as customers' request |
|||
Tolerance |
a) Outer Diameter: +/- 0.2mm |
|||
b) Thickness: +/- 0.02mm |
||||
c) Length: +/- 5mm |
||||
Surface |
180G, 320G, 400G Satin / Hairline 400G, 500G, 600G or 800G Mirror finish |
|||
Application |
Decoration construction, upholstery, industry instrument Handrail, Railing, Staircase, Door, Window, Balcony, Fence, Bench, Furniture |
|||
Test |
Squash test, extended test, water pressure test, crystal rot test, heat treatment, NDT |
|||
Chemical Composition of Material |
Material Composition |
201 |
202 |
304 |
C |
≤0.15 |
≤0.15 |
≤0.08 |
|
Si |
≤1.00 |
≤1.00 |
≤1.00 |
|
Mn |
9-11 |
7.5-10 |
≤2.00 |
|
P |
≤0.06 |
≤0.06 |
≤0.045 |
|
S |
≤0.03 |
≤0.03 |
≤0.030 |
|
Cr |
13 |
17-19 |
18-20 |
|
Ni |
0.80-1.5 |
4-6 |
8-10.5 |
|
Cu |
0.70-1.0 |
|
|
|
Mechanical Property |
Material Item |
201 |
202 |
|
Tensile Strength |
≥535 |
≥520 |
|
|
Yield Strength |
≥245 |
≥205 |
|
|
Extension |
≥30% |
≥30% |
|
|
Hardness (HV) |
<253 |
<253 |
|
Terms |
Payment |
(1)30% in advance, the balance against b/l copy by tt within 3day (2) 30% in advance, the balance by l/c at sight (large quantity) |
Delivery time |
prompt |
|
Advantage |
we have our own steel plant,cold rolled factory,and pipe-making factory , best quality with reasonable price |
|
Packing |
Every tube is sleeved in plastic bag individually, and several tubes are packed to be bundle without any logo. |